GENERAL IMPROVEMENTS
FLATNESS
< TOLERANCE INCREASE MOULD INJECTION SIDE TEMPERATURE
> TOLERANCE DECREASE MOULD INJECTION SIDE TEMPERATURE
PITCH
< TOLERANCE INCREASE HOLDING PRESSURE TIME AND TOTAL CYCLE TIME
> TOLERANCE DECREASE HOLDING PRESSURE TIME AND TOTAL CYCLE TIME
BREACKING LOAD
< TOLERANCE INCREASE HOLDING PRESSURE AND MELT TEMPERATURE
SURFACE
WITHE SPOT ADJUSTING NOZZEL TEMPERATURE AND DECREASE CHARGE TIME
INCONSISTENT COLOR INCREASE BACK PRESSURE AND MELT TEMPERATURE
BUBBLE AIR INSIDE THE MOLDED PARTS
PA 6 DECREASE MELT TEMPERATURE AND INCREASE HOLDING PRESSURE TIME
BUBBLE AIR ON SURFACE OF MOLDED PARTS
PA 6 POSSIBIBLE HUMID MATERIAL OR POLLUTED MATERIAL (EXAMPLE BY PP)
POM
只有这些内容啊。期待更多的英语方面的注塑模具信息。 |